Pregled posta

Adresa bloga: https://blog.dnevnik.hr/14k-belly-ring

Marketing

O Ring Installation


O ring installation. Promise rings for girlfriend under 100. Cheap rings for men.


o ring installation







    installation
  • A thing installed, in particular

  • A large piece of equipment installed for use

  • The action or process of installing someone or something, or of being installed

  • the act of installing something (as equipment); "the telephone installation took only a few minutes"

  • initiation: a formal entry into an organization or position or office; "his initiation into the club"; "he was ordered to report for induction into the army"; "he gave a speech as part of his installation into the hall of fame"

  • facility: a building or place that provides a particular service or is used for a particular industry; "the assembly plant is an enormous facility"





    o ring
  • (O-Rings) are generally used as dynamic seals for shafts and are available in many different sizes and materials.

  • A gasket in the form of a ring with a circular cross section, typically made of pliable material, used to seal connections in pipes, tubes, etc

  • a gasket consisting of a flat ring of rubber or plastic; used to seal a joint against high pressure

  • An O-ring, also known as a packing, or a toric joint, is a mechanical gasket in the shape of a torus; it is a loop of elastomer with a disc-shaped cross-section, designed to be seated in a groove and compressed during assembly between two or more parts, creating a seal at the interface.











o ring installation - New CABLES


New CABLES TO GO COMPRESSION F CONN O-RING RG6 QUAD 10PK Nickel 0.190lbs High Frequency



New CABLES TO GO COMPRESSION F CONN O-RING RG6 QUAD 10PK Nickel 0.190lbs High Frequency





The bright nickel finish withstands harsh environments, and reduces the effects of oxidation. Notice: $50 charge per refused shipment unless the refusal is based on our error. Customers should thoroughly inspect all cartons for damage before signing for the shipment. Damage: Must be reported within 15 days from delivery date. Shortage/Fallout: Must be reported within 15 days from delivery date. Loss: Must be reported within 30 days from ship-date. If you have any other questions about the product, please contact us any time.






89% (15)










Hellbound




Hellbound







Scanned from 1978 Kodak print. My 4 year old son goes for a ride with dad. Radical Jim Davis front section frame and a 100% chrome plated engine featuring hex cut cyclinders, Sifton cams, Mikuni 38mm carb and .060 overbore pistons. The bikes name is lettered in goldleaf on the top of the Bob Munroe "rocket tank".
The build of Hellbound began when I purchased an XLCH engine from a wrecked bike we had originally built at my chopper shop. The motor was 100% chrome plated and had low miles when wrecked but the fins on both heads and barrels were broken. I found a set of stock heads and barrels at a cycle salvage shop another friend owned. Arlen offered to hex cut the barrels and remove the lower three fins before sending them out to the chrome shop. You can't see it in the photos but this was something we were doing to Sportsters in 1976. We also cut the rocker boxes into two parts and rerouted the top end oil lines. Countersinking the rocker box allens also also made the engine appear smoother. One of the design themes we followed was make everything smaller or eliminate it if possible. For example, we cut off the first 1 inch of the rubber handlebar grips and shortened the stock clutch lever removing the ball end and about 1 inch of the lever itself. Magnetos meant no batteries and spool 21 inch front wheels meant no brake lever,cable or brake drum. We even trimmed the license plates which really pissed off the CHP. I bought a stock frame from another friend and had Jim Davis, Arlen's frame builder, install one of his latest gooseneck front sections. The radical 45 degree rake was Arlen's idea and his 6 inch over stock springer barely made the bike level with the short struts used to replace the shocks.

The night I assembled the engine Arlen came over to help. He had done the work on the barrels himself and then had them chromed. I had them bored .060 over and fitted forged pistons. Arlen held the barrel while I compressed each ring using my thumbnails, squeezing the ring with both hands. One by one we worked the barrel down over all three rings. Then he worked on one side of the motor installing the magneto, oil lines etc. while I installed the clutch, primary chain etc. Together we fitted the manifold, o-rings and carb. It was after 2AM when we finished the motor and Arlen had a 90 minute drive back to the bay area.

The first paint job was black with gold and silver leaf scroll work. I rode the bike to work daily and had to fill the 1.75 gallon tank each afternoon or or I wouldn't make it home from work the following day. On a weekend run with friends I let a guy ride while I drove the chase truck. He ran out of road on a curve and laid the bike down causing major damage to the paint and chrome on the springer. A rebuild followed and I changed the color to cobalt blue pearl as shown in the photos with this story.

I rode the bike the following summer and fall, then entered it in the famous Oakland Roadster Show that winter with the understanding Arlen would pick up the bike after the show and put it in his shop for sale. After the show it was common practice to start the bikes and ride them out of the building. Turns out that Arlen's employee was drunk and decided to do burnouts in the parking lot showing off. He flipped the bike end over end and wrecked it a second time. I had already purchased a 1978 XLCR which I was riding, so had wheels while rebuilding and repainting Hellbound for the third and final time. Shit happens, I was always building a bike while riding the one I just finished and the rebuilds went quickly each time.

We were all riding and building in our garages, helping each other with the work. I was the paint guy, others did the welding or machining. Some, like Bob Munroe and Jim Davis were fabrication guys and could make anything. We rode on weekends, often on overnight runs with groups of 40 or more bikes. Sleeping on the ground and holding "safety meetings" in what ever tavern we came across. Bowling Alleys were always good for biscuits and gravy to "grease up" for the drinking that was to follow. When we rode on the highways the CHP usually shadowed the group and radioed ahead. Local cops met us at the city limits and watched us until we left their town. Occasionally the last bike in the pack got pulled over and issued a bullshit citation for something. New guys had to ride in the back. During the chopper boom of the 70's almost everyone worked on their own bike. Chopper shops like mine and Arlen's sold parts only, no installation work preformed, this was common at the time.













Cape Town Stadium panorama




Cape Town Stadium panorama







[Best viewed at original size (?13.3MB, Flickr Pro only) or large]

In another first for the new Sail Stadefrance managed Cape Town Stadium in Green Point, two rugby matches were played at the venue for the first time on Saturday 6 February 2010. The event, the second in a series of three planned dry runs leading up to the kickoff of the 2010 FIFA World Cup in June, drew a crowd of 40 000 spectators who filled the first two levels of seating to capacity.

The curtain raiser saw the SA Legends defeat a star-studded International Legends 22-5 in the ten-a-side format of the game. After a lap of honour and some entertainment from local band Flat Stanley, the Vodacom Stormers clashed with Boland Invitational XV in a pre-season Super-14 warm-up game. The Stormers walked away with the trophy after thumping their opponents 47-13.

In this high resolution panorama of the stadium, taken at halftime, you can see the glass roof, "Ring of Fire" (i.e. spot-lights) and the installation of temporary seating, ahead of the 2010 FIFA World Cup in June, which boosts the stadium's capacity to 68 000 seats.

You'll need to please ignore the image's imperfections, thanks largely to my stitching software and the amount of retouching that was necessary.











o ring installation







See also:

interlocking engagement ring

engagement rings in dubai

tension set titanium rings

7 carat diamond engagement ring

engagement ring setting only

princess cut channel set engagement ring

artisan engagement rings

interlocking engagement rings

trillion cut engagement rings





Post je objavljen 30.08.2011. u 20:18 sati.